Quantity Surveying Services & Bills of Quantities
Request a bill of quantities for tender comparison, procurement planning or a cost-plan review. F&K organizes measured items, units and drawing references in Excel, with allowances and cost notes separate from quantities. Agree any additional contract-administration scope in the quote.
Bills of quantities are typically quoted at $150–$1,000. Most quantity-surveyor estimates take 24–48 hours, with the fee set by project size and scope.
Representative Quantification & BOQ Deliverable
| Work Item / Specification | Quantity | Unit |
|---|---|---|
Bill No. 1: Preliminaries & General Requirements | 1.0 | ITEM |
Bill No. 2: Substructure & Foundations Concrete | 3,850 | CY |
Bill No. 3: Superstructure Structural Steel Framing | 640.0 | TONS |
Bill No. 4: External Envelope, Roofing & Glazing | 28,000 | SF |
Bill No. 5: Internal Finishes, Drywall & Ceilings | 95,000 | SF |
FROM THE PUBLISHED F&K PORTFOLIO
Review the quantity evidence: Concrete & site quantities
These selected workbook lines show how measured quantities, source references and allowances are kept separate. They demonstrate this sample scope, not a complete estimate or proof of every trade offered on this page.
| Source item | Base quantity | With source allowance | Drawing / cell |
|---|---|---|---|
| 2'-0" W x 1'-0"D x 192' L Cont Concrete Footing | 14.222 CY | 15.644 CY | S1 · F16 |
| (2) Cont #5 Rebars | 400.512 LBS | 440.563 LBS | S1 · F17 |
Display rounded to three decimal places. Source units and original values are retained; no project award, client endorsement or priced total is implied.
Open the full sample context and drawing referencesReview the format before sending plans: download sample construction estimates and marked plans, then check estimating fees and scope factors.
Send Your Plans for a Project Quote
Upload your architectural, structural, or engineering drawings. Include your trade scope, project location and bid deadline. The quote will confirm the fee, deliverables and delivery date.
Request Quantity Surveyor Services
Quantity Surveying (QS) estimating inquiry
Confirm the project location
Scope and pricing inputs depend on the issued documents and project location. Review our US estimating service areas and include the project ZIP code, drawing revision and bid deadline in your request. These are service areas; availability and deliverables are confirmed in the quote.
Specialized construction takeoffs
Review materials, units and scope
Confirm your deadline before work starts
Plan-based quantity takeoffs
Confirm the boundaries of your quantity surveyor services request
Identify the current drawing revision, included systems, alternates and addenda. Agree whether labor, equipment, demolition, testing, permits, taxes, freight and owner-furnished items are included. Missing design information needs a recorded allowance or clarification; estimating does not replace engineering design or code approval.
Keep measured quantities separate from waste and procurement allowances. For a priced estimate, confirm the project location, pricing date, supplier inputs and labor basis. Final bid qualifications and markups remain subject to contractor review.
What Does a Quantity Surveyor (QS) Do?
In modern commercial construction, cost overruns and contract ambiguities can severely diminish development returns. An independent Quantity Surveyor acts as the financial guardian of the project—ensuring every cubic yard, linear foot, and dollar spent is rigorously measured, verified, and contractually substantiated.
Order of Cost Estimate
Early feasibility screening, parametric cost modeling & budget baseline
Standardized Bill of Quantities (BOQ)
Detailed measurement across all trades per NRM2 / CSI standards
Tender Management & Procurement
Tender document preparation, bid comparison & contractor selection
Monthly Progress Valuation
On-site progress inspections, payment certificate validation & draws
Change Order & Risk Management
Contract variation auditing, scope defense & dispute resolution
Final Account Settlement
Comprehensive closeout reconciliation & final payment certification
What Is Included in Quantity Surveyor Services?
Every estimate prepared by F&K Estimatings delivers an exhaustive line-item breakdown formatted for material suppliers, specialty subcontractors, and general contractor bid reviews.
Bills of quantities are typically quoted at $150–$1,000. Most quantity-surveyor estimates take 24–48 hours, with the fee set by project size and scope.
| Estimate Component | Included Scope & Line Items | Unit of Measure |
|---|---|---|
Standardized Bill of Quantities (BOQ) | Comprehensive line-item measurement of all physical works categorized under CSI MasterFormat or NRM2 standard methods. | Formal BOQ Document |
Pre-Tender Estimate (PTE) | Independent client cost model used to benchmark contractor bids and establish maximum contract price limits. | Cost Benchmark Report |
Tender Evaluation & Bid Leveling | Line-by-line commercial comparison of incoming contractor tenders to identify price front-loading, exclusions, and errors. | Tender Analysis Matrix |
Schedule of Rates & Unit Price Book | Pre-negotiated unit rates for potential contract variations, rock excavation, additional concrete, and change orders. | Rate Book Schedule |
Monthly Interim Payment Valuations | Independent verification of contractor payment applications (AIA G702/G703), stored materials, and retainage release. | Payment Certificate |
Variation / Change Order Auditing | Forensic cost evaluation of contractor claims, time extension impacts, and disputed change orders. | Variation Audit Report |
Value Management & Engineering | Systematic cost optimization workshops evaluating lifecycle performance, material substitutions, and savings. | Value Engineering Log |
Final Account Closeout Reconciliation | Negotiation and final settlement of all contract additions, credits, prime cost sums, and provisional allowances. | Final Account Statement |
Life Cycle Costing (LCC) Studies | Long-term operational, maintenance, and replacement cost modeling over a 30-year building lifecycle. | LCC Analysis Model |
Color-Coded Marked Drawing Sets | High-resolution Bluebeam PDF drawings verifying every single quantity and measurement in the BOQ. | Audit-Ready PDF Plans |
Quantity Surveyor Services Scope & Material Quantities
Select a category below to explore our specific measurement parameters and deliverable formats.
Standardized Bills of Quantities (NRM2 / CSI MasterFormat)
Rigorous quantity takeoff and BOQ compilation providing a uniform pricing basis for tender bidding.
Deliverable Format
Standardized Bill of Quantities spreadsheet formatted for competitive tender pricing.
International Quantity Surveying Standards
Our quantity surveying deliverables conform to international and North American professional standards including RICS (Royal Institution of Chartered Surveyors), NRM, ASPE, and CSI MasterFormat.
Every BOQ line item is transparent, legally enforceable, and audit-ready.
Order of Cost Estimating
Capital building works cost planning and elemental models.
Detailed Measurement
Standardized Bill of Quantities (BOQ) preparation.
Building Maintenance
Post-construction asset maintenance and lifecycle costing.
MasterFormat Standard
North American standard trade specification structure.
Contract Payment Certification
Standard schedule of values progress payment auditing.
Life Cycle Costing (LCC)
Whole-life asset performance and sustainability cost models.
What a Quantity Surveyor Services takeoff counts
These are the scope items measured from the drawings you send. CSI MasterFormat numbers below are the divisions this trade is usually filed under. Software names are tools estimators in this trade commonly use. F&K confirms the Excel and PDF formats in the quote and does not sell software seats.
Scope items counted
- Standardized Bill of Quantities (BOQ per NRM2 / CSI)
- Pre-Tender Independent Cost Estimates (PTE)
- Tender Document Preparation & Procurement Management
- Contractor Bid Leveling & Unbalanced Rate Auditing
- Interim Monthly Payment Certification (AIA G702 / G703)
- Contract Variation / Change Order Forensic Auditing
- Value Management & Engineering Savings Reports
- Final Account Settlement & Dispute Resolution
- Life Cycle Costing (LCC) 30-Year Performance Models
- Pre-Construction Development Feasibility Studies
- Substructure & Superstructure Concrete BOQ Items
- Structural Steel & Metal Decking BOQ Schedules
- Architectural Envelope, Roofing & Glazing BOQ Items
- Mechanical, Electrical & Plumbing (MEP) BOQ Packages
- Civil Earthwork, Paving & Underground Utilities BOQ
- Color-Coded Marked Bluebeam PDF Audit Drawings
CSI MasterFormat division numbers
International Quantity Surveying Standards
- NRM 1Order of Cost Estimating
- NRM 2Detailed Measurement
- NRM 3Building Maintenance
- CSI 50-DivMasterFormat Standard
- AIA G702Contract Payment Certification
- ISO 15686Life Cycle Costing (LCC)
Software commonly used in this trade
Estimators working this scope commonly measure and mark drawings with the tools below. This is an industry list, not a claim that every file is produced in one named program.
- CostX
- Bluebeam Revu
- PlanSwift
- Microsoft Excel
Standardized Bill of Quantities (BOQ) Precision
A professional Bill of Quantities (BOQ) eliminates ambiguity between owners, architects, and contractors by establishing a standardized, legally binding schedule of work. Every contractor prices the exact same quantities, making bid comparison 100% transparent.
Need Help with Quantity Surveyor Services?
Send your drawing sheets for a dedicated takeoff schedule.
QS Engagement Standards
Standard quality benchmarks applied across all files:
Quantity Surveying (QS) vs. Basic Estimating
Understanding whether your team needs raw quantity measurements or a fully priced bid estimate helps you order the exact service you require.
F&K Quantity Surveyor Services Quantification & Review Workflow
Our systematic 7-step engineering process eliminates missing elements, prevents duplicate counts, and delivers defensible estimates.
Project Initiation & Document Ingestion
We review architectural, structural, civil, and MEP drawings, specifications, contract forms (AIA, FIDIC), and milestones.
Standardized Quantity Measurement
Our quantity surveyors measure all project elements per NRM2 / CSI rules using digital takeoff software.
Bill of Quantities (BOQ) Compilation
We compile comprehensive, itemized BOQ spreadsheets with detailed specification descriptions and provisional sums.
Pre-Tender Estimate (PTE) Pricing
We apply regional labor wage rates and current market material indices to establish an independent baseline budget.
Tender Analysis & Contractor Bid Leveling
We review incoming contractor tender submissions, normalize rates, eliminate omissions, and recommend award.
Post-Contract Valuations & Variation Audits
We audit monthly progress payment applications, inspect on-site progress, and evaluate contractor change orders.
Final Account Settlement & Closeout
We reconcile all contract adjustments, negotiate final settlements with contractors, and issue closeout certificates.
Quantity Surveyor Services for Every Construction Sector
From commercial tenant fit-outs to heavy industrial complexes, we adapt our takeoff methodology to project specifications.
Multi-story office towers, mixed-use podiums, retail shopping centers, and hotel resort complexes.
Master-planned residential communities, luxury custom estates, garden apartments, and townhomes.
Logistics fulfillment centers, chemical processing plants, refineries, and automated facilities.
Hospitals, medical research labs, outpatient surgery centers, and cleanroom bio-pharmaceutical suites.
Roadway networks, bridge structures, airport facilities, water treatment plants, and earthwork grading.
University campuses, public high schools, civic government centers, and public libraries.
Quantity Surveyor Services Elements We Quantify
How Quantity Surveyor Services Costs Are Calculated
Material and labor costs fluctuate drastically by project geography, supplier logistics, trade union jurisdictions, and site conditions. We do not use flat national averages.
Confirm the pricing date, project ZIP code, supplier quotations, labor basis and equipment allowances in the project brief. Identify any owner-supplied rates or provisional costs separately.
Scope Lifecycle Phase (Pre-Contract vs Post-Contract)
Pre-contract BOQ preparation involves fixed fees; post-contract administration is managed via monthly retainers.
Contract Form & Procurement Method
Standard AIA, FIDIC, NEC, or GMP contracts require specialized administrative documentation and compliance checks.
Project Scale & Total Capital Expenditure (CapEx)
Larger bills of quantities take more sheets to measure. The quote still names one fee. There is no promotional discount.
Measurement Standard (NRM2, SMM7, POMI, CSI)
Strict international measurement standards (NRM2/RICS) require detailed itemization and specification descriptions.
Dispute Complexity & Claim Auditing
Forensic change order defense and delay claim analysis require senior dispute resolution specialists.
Representative Quantity Surveyor Services Scenarios
Review illustrative project models demonstrating how Quantity Surveying (QS) quantities are extracted, itemized, and structured under standard contractor bidding conditions.
Senior Quantity Surveyor Services Oversight
Agree the scope and review requirements for your project. Check quantities against the supplied drawing revision and record unresolved items before preparing a final bid.
What to Review Before Using an Estimate
When bidding tight commercial deadlines, subcontractors cannot afford incomplete takeoffs or guesswork. A clear estimating brief helps identify the quantities, pricing inputs and qualifications needed for bid review.
Plan-Based Accuracy
Request drawing references and identify allowances separately from measured quantities.
Addenda Protection
Identify addenda and agree the revision scope, fee and delivery date.
Ready for Subcontractor Bids
Confirm the spreadsheet format, formulas and cost inputs required for your bid.
National Geo Pricing
Confirm the project ZIP code, pricing date, supplier quotations and labor basis.
Quantity Surveyor Services FAQs
Detailed technical and commercial answers to help you navigate quantity surveyor services, material scheduling, and bid preparation.
Q1What is the difference between a Quantity Surveyor and an Estimator?
Q2What is a Bill of Quantities (BOQ)?
Q3Can you audit contractor change orders and payment applications?
Q4What measurement standards do your Quantity Surveyors use?
Q5What is your typical turnaround time for a Bill of Quantities (BOQ)?
Q6Do you assist commercial lenders with construction loan draws?
Q7Are your BOQs delivered in editable format?
Q8How do you handle revisions, addenda, and contract variations?
Q9How much do Quantity Surveyor services cost?
Q10How do I get started?
Related Estimating Services & Trade Scopes
Define the bid package handoff
For a contractor bid, identify the trade package, issued plan revision, specifications, alternates and the responsibility for adjoining work. Separate measured quantities from unit prices, subcontractor quotations and project allowances so the bid reviewer can trace each assumption.
Agree the spreadsheet columns, drawing references, exclusions, pricing date and revision allowance before work starts. An addendum or changed scope needs an identified issue date and change record; an illustrative sample does not establish project-specific pricing or specialist experience.
Compare commercial bid estimating scope with the published sample evidence, then request the required handoff.